Our Portfolio

Royal Commission Jubail

Yanbu Yasref

Ibn Rushd Yanbu

Saudi Kayan Petrochemical

Khursaniyah Gas Plant

Sipchem Petrochemical (EVA)

Petro Rabigh/Petro Chemical

Wasit Gas Plant

Sadara MFC

Kemya Al-Jubail Petrochemical

Sadara ISO

Fadehli Gas plant

Maaden Ummwu'al Phosphate

Gizan Refinery

Gizan Port

Successfully Move & Install Double Girder EOT Crane

Supply & Installation of Additional Electric Overhead Travelling Crane (EOT) in Compressor, and installation of isolation switch for new crane, power, grounding cables, cable tray supports, termination Jb, wireless pannel with radio remote control. Civil works includes road cutting and paving road with concrete excluding culvert cutting. Excavation for cable

Exchanger Replacement @ UNITED

We performed Design, Engineering, Supply, Installation, Testing and Commissioning assistance of new C20 filter to remove the insoluble polymer and metals thereby improving the quality of C20 product.

Heat Stress Campaign

The project involves procurement, fabrication, modification, construction, testing and commissioning of methanol recovery Waste Higher Alcohol (WHA) side cut unit for plant II. WHA system comprises of pumps,

Replacement of Oxygen Mixing Station

Supply, Fabrication, Installation, Demolition and Commissioning works for Installation of Oxygen Mixing Station (OMS) with related Nitrogen lines & Valvesin order to maintain the integrity of the OMS system along with associated Nitrogen system.